IAC were recently commissioned by Select Butchery Ltd to design supply and install a new super efficient Pack system for their meat processing plant in Hainault, Essex.
The design remit was to remove the existing plant which consisted of individual R22 condensing units and evaporator sets and to replace with a fully integrated 250 KW Pack, operating the whole area via a selection of step controlled /inverter driven compressors linked to a head pressure controlled remote condenser.
All works had to be carried out in the fully operational working environment and to the stringent hygiene rules that Select operate within.
The resultant scheme produced energy savings in the first quarter of use in excess of 30% meaning the investment will be repaid in no time at all!
IAC undertook the design through to final commissioning for this prestigious project and once again delivered on time, on budget and with the desired happy client.