IAC Services were appointed as principle contractor for the design, supply and installation of Daikin VRV Air Conditioning Equipment into 5 Hotels recently refurbished for Holiday Inn in an order valued at over £2M.
In addition to the conventional installation of the Daikin VRV Air Conditioning equipment our works additionally included for all aspects of the installation including local planning issues together with local authority planning approval, all environmental noise considerations and issues including noise surveys and the subsequent acoustic requirements for the installation, all structural steelwork design, drawing preparation, manufacture and installation, all builders work to enable the interconnecting services to be installed, all mains electrical wiring from the main incoming supply of each Hotel and new distribution boards.
Added to this that no bedrooms were taken off hire throughout the installation and you will appreciate the level of contract management that went into this project. All rooms were let each night if required with the rooms and corridors being available to us between 9.00 am and 4.30 pm. Each of the 520 bedrooms we installed air conditioning into is fitted with an energy saving card operated device, ensuring that when not occupied the systems do not operate unnecessarily wasting valuable energy resources.
Added to this that all equipment once installed is operated via a Daikin Central Intelligent Touch Controller to enable remote monitoring and operation of the bedroom air conditioning units the system is one of the most economical available.